Maintenance And Winterising; Maintenance; Winterising - Hayward ENERGYLINE PRO Manual De Instalación E Instrucciones

Ocultar thumbs Ver también para ENERGYLINE PRO:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 70

5. MAINTENANCE AND WINTERISING

5.1 Maintenance

These maintenance operations must be carried out once per year in order to
guarantee the longevity and the good working condition of the heat pump.
Clean the coil with the help of a soft brush or jet of air or water (Warning,
never use a high pressure cleaner).
Verify that the drains flow well.
Verify the tightening of the hydraulic and electrical connections
Verify the hydraulic sealing of the condenser.
Before any maintenance operation, the heating pump must be
disconnected from any electrical current source. The maintenance
operations must only be carried out by personnel that is qualified and
authorised to handle liquid refrigerants.

5.2 Winterising

Put the heat pump in "OFF" mode.
Cut the power supply to the heat pump.
Empty the condenser with the help of the drain to avoid any risk of
deterioration. (high risk of freezing).
Close the by-pass valve and unscrew the entry/exit connection unions.
Eliminate the maximum amount of residual stagnant water from the
condenser with the help of an air gun.
Close the water entry and exit areas of the heating pump to avoid
introducing foreign bodies.
Cover the heating pump with a dedicated winterising case.
Any damage caused by poor winterising maintenance will lead to
cancellation of the warranty.
19
Tabla de contenido
loading

Tabla de contenido