2.4 - Wiring diagrams

2.4.1 - Wiring diagram of single-phase
Fig. 2.4.1
12
3.3 – Installation site
IMPORTANT!
The site where you intend to install the machine must be solid and horizontal and the
base must be sturdy enough to withstand its weight safely.
In addition, the machine must have ample space around it (overall encumbrance), as
shown in Fig. 2.4.1. This allows the operator greater manoeuvrability during work and
will facilitate future maintenance.
Provide sufficient lighting around the machine, in order to ensure proper visibility to the
operator who is using the mixer.
3.3.1 - Installation
Use a forklift or other similar equipment to handle the pack-
age, as the machine is supplied on a pallet protected with
cardboard.
 Remove the two straps that hold the cardboard box fas-
tened to the pallet.
 Remove the cardboard.
 Remove the cellophane wrapped around the machine
and any other packing material inside.
3.3.2 - Packaging disposal
Packing components like cardboard, nylon and wood are products comparable to solid
urban waste, which makes them freely disposable.
If the machine is delivered in countries where there are particular requirements for
waste disposal, dispose of the packaging in accordance with the regulations/standards
in force.
3.3.3 – Handling the machine
Lift the machine with a forklift of suitable capacity.
Check the stability and position of the load on the forks, especially along rough, slip-
pery or titled surfaces. During handling, keep the load as low as possible to ensure
greater stability and visibility. Widen the forks to stabilise the grip as much as possible.
At least two operators are required to manually handle the mixer.

3.4 - Electrical connection

IMPORTANT!
Check that the power supply corresponds to the value shown on the machine identifi-
cation plate. All tasks on electrical components must be carried out only by special-
ised personnel that is expressly authorised by the on-site manager in charge. Connect
the machine to a network with efficient earthing.
Fig. 3.3.1
17