EVBOX Elvi Manual Del Usuario página 12

Ocultar thumbs Ver también para Elvi:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 63
EN
switch charging cable
(optional)
Step 4
Take the new charging cable out of the box. Place the station
on its side and plug the cable into the station.
Make sure you press it until the charging cable plug with
LED ring is firmly secured and lays flush to the surface of the
charging station.
Step 5
Turn the station around and put the front face of the station on
a soft and stable surface. Place the bolt and firmly tighten the
bolt with a T30 bit.
Step 6
Re-confirm that the cable bolt is tightened properly.
Check if the charge cable is firmly connected to the station and
LED ring is at same height as the
icon.
Double check if charge cable plug is properly secured into the
station with the bolt!
Step 7 - You're all set!
Align the station against the wall dock and the connectors
and press until you hear a clicking sound.
Important note for your installer
When upgrading your charging cable to a version that is suitable for higher power
application, make sure the applied RCD and MCB in the service panel are in line with local
regulations, and are adequate for the type of installed charging cable and the amount of
power Elvi can release (3.7, 7.4, 11 or 22 kW). Switch on the power to Elvi. Check with your
installer if the selected output power from your Elvi can be supported by your local electrical
installation. The setting of your maximum available power in the Hey EVBox app may need
to be adjusted to the new situation.
CLICK
7
Tabla de contenido
loading

Tabla de contenido