Installing The Operator - CAME F500 Manual De Instalación

Ocultar thumbs Ver también para F500:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 50

5.5 Installing the operator

The following illustrations are only examples, given that the space available for anchoring the operator and accessories may vary
from gate to gate. It is up to the installer, thus, to choose the most suitable solution.
Lay the corrugated tubing needed for the connections deriving from the junction box.
N.B. the number of tubes depends on the type of system and accessories employed.
1) Trace the centre lines and external dimensions of the entire assembly in accordance with the diagrams on pages 2 and 3.
Next, mount the fl ange for the gear motor on the wall or pillar, and mount the anchor block for gear motor F500 on the gate.
F500
F510
56
80
5 x ø 8,5
56
12
12
80
Electric cable junction box
50
5 x ø 8,5
2 x ø 6,5
80
3 x M6
150
150
50
400
50
Tabla de contenido
loading

Este manual también es adecuado para:

F510

Tabla de contenido