Craftsman 25416 Manual De Las Instrucciones página 24

Tabla de contenido
2
1. Front bagger tube
2.
Vinyl binding
2
3.
Spreader bars
4.
Retainer spring
5.
Vinyl binding
4
5
\
4
7
8
6.
Dump handle tube
7.
Clevis pin 10 x 44mm
8.
Retainer spring
9.
Cap
9
1. Top Surfaces Even
2.
Horizontal Adjustment Bracket
3.
Vertical Adjustment Bracket
4.
Bagger Latch
2
3
3
5
6MM
(1/4")
- 9MM
(3/8")
To Assemble
Bagger
Unfold bag by pivoting front bagger tube all the way
forward and pressing the bottom vinyl binding onto the
tube.
Inside the bag, install spreader bars and retainer springs
onto pins on both sides of bag as shown.
Press the vinyl bindings onto the sides of front bagger
tube.
Slide the bagger dump handle through the hole in the
bagger top, install the clevis pin 10 x 44mm and secure
with retainer spring.
Push cap over end of bagger dump handle.
NOTE: For future use, the clevis pin may be removed in
order to use the handle to clear the chute in the event it has
become clogged.
Bagger
adjustment
For proper bag function and appearance,
it may be neces-
sary to adjust the bagger assembly. There should be 6mm
(1/4")-9mm (3/8") gap between the bagger top and fender and
the bagger top surface should be even with the top surface
of the fender. To adjust bagger position:
Horizontal
adjustment
Slightly loosen the nuts securing the bagger RH and LH
horizontal adjustment brackets. Loosen only enough so
the brackets keep their position, but allow them to be
moved.
Move the brackets
the amount forward
or backward
you wish the bag assembly to move. Retighten the nuts
securely.
Vertical
adjustment
Slightly loosen the nuts securing the vertical adjustment
brackets. Loosen only enough so the brackets keep their
position, but allow them to be moved.
Move the brackets the amount up or down you wish the
bag assembly to move. Retighten the nuts securely.
Reinstall the bagger assembly and check the bagger to
fender fit. If necessary, repeat the procedure until proper
fit is attained.
After proper fit is attained, remove bagger from tractor
and install bagger latch (4) to tractor back plate as shown.
Tighten securely.
Install and carefully lower bagger to actuate batch.
Measure distance between bagger and latch as shown.
If distance is not 10mm - 16mm carefully remove bagger
and repeat vertical adjustment as needed.
m
T
IOMM (7/16")- 16MM (5/8")
4
To convert to bagging,
mulching
or dischargeSee
"Section
5" of this manual.
24
Tabla de contenido
loading

Tabla de contenido