www.allice.de
R&S ENV216
6.3.1 Measuring the Protective earth conductor's resistance
Operating Manual 5201.6693.14 - 03.00
During the measurement, the entire length of the wire is to be moved in sections. If a
change in resistance is noted while part of the wire is being moved, the fault must be
found with a detailed troubleshooting procedure. Defective cables must not be
repaired. They must be replaced in all cases.
The resistance of the PE connection must be checked by a measurement according to
fig. 1.
The test current is set to 10 A
Equipment under Test
L
N
PE
Fig 1.: Measuring the resistance of the PE connection with device disconnected from
the mains.
In addition to the usual points, measurements should also be taken from the PE
contact of the mains plug to the bolt on the rear panel of the R&S ENV216.
ENV216
Rear Panel
Allice Messtechnik GmbH
.
DC
Earth Ground Resistance Tester
-
+
Voltmeter
-
+
DC
Current
Source
Servicing
Power
Cord
PE
29