EdilKamin CALGARY Instalación Uso Y Mantenimiento página 37

Ocultar thumbs Ver también para CALGARY:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 68
Fig. 1
Fig. 2
Fig. 3
Feed screw to hopper
INSTRUCTIONS FOR USE
N
M
Gear motor
T
N
M
PELLET LOADING VIA SCREW FEED SYSTEM
(optional)
The boiler is preset for pellet loading via a screw feed system.
For installation proceed as follows:
NOTE:
before proceeding turn off the boiler and disconnect the
electrical power cable
Fig 1 - 2
• Remove the pre-cut lidon the back of the boiler (fi g. 1) un-
screw the fastening screws of the closing fl ange located under
the pre-cut lid and replace it with a fl exible pipe connection
fl ange (M-fi g. 2).
Fig 3
• Connect the fl exible pipe (N) on one side to the fl ange (M) on
the boiler and on the other side to the feeder conveyor pipe(T).
Note: the fl exible pipe (N) must be located so as to carry the
pellets into the hopper without causing bottlenecks; verify
correct pellet sliding during the fi rst loads and seal any
powder leaks with silicone.
- 37
-
Tabla de contenido
loading

Este manual también es adecuado para:

Orlando

Tabla de contenido