Your 3M™ Series 230 Turbine package includes:
• Heavy Duty 3 Stage Turbine Unit
• Bleed or Non-Bleeder Spray Gun
• Cup Assembly
• 30' (9m) Atomizing Air Hose with 3' (0.9m) Whip Hose
• Spray Gun Care Kit
Your 3M™ Series 240 Turbine package includes:
• 4 Stage Turbine Unit
• Bleed or Non-Bleeder Spray Gun
• Cup Assembly
• 30' (9m) Atomizing Air Hose with 3' (0.9m) Whip Hose
• Spray Gun Care Kit
Turbine Package Set Up Instructions
Check List – Before You Spray:
• Locate turbine unit as far from the spray area as possible.
• Be sure the spray area is well ventilated.
• Be sure that the pressure relief vent at the rear of the turbine is free of obstructions.
• Be sure that the cup pressure relief screw is closed.
• Test fan pattern on scrap material first.
3
6