Switch Box; Use; Control Panel - PLYMOVENT DUAL GO Manual De Instalación Y De Uso

Ocultar thumbs Ver también para DUAL GO:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 37
A
B
C
D
E
F
Fig. 4.2 Arm to stationary unit
4.5
Mounting of the hood
To install the extraction hoods, do the following.
Hose tube arm (EconomyArm): refer to Fig. 4.3
Metal tube arm (KUA): refer to Fig. 4.4
• Loosen the mounting material that is attached to the hood
hinge.
• Install the extraction hood (G) with the bolt (F), 2 washers
(E), 2 spring washers (D) and a locknut (C).
• Install the hood collar (H) to the hood (G). Fasten it with
the clip.
• Install the hose tube (A) to the hood.
• Fasten the hose tube with a hose clamp (B).
A
B
C
D (2x)
E (2x)
G
H
Fig. 4.3 Hood mounting (hose tube arm)
0000111692/150418/A DualGo
B
D
F
G
G
F
A
B
C
D (2x)
Fig. 4.4 Hood mounting (metal tube arm)
4.6

Switch box

• Install the switch box at an appropriate position.
• Connect the switch box to the filter unit and to the mains
in accordance with the separately supplied electrical
diagram.
5

USE

WARNiNG!
Fire hazard! Do not use the product for polishing
applications in combination with grinding, welding or
any other application that generate sparks.
Refer to chapter 3 / Safety instructions / Use.
5.1

Control panel

The DualGo has a separate switch box to put the unit on and
off. Controls and indicators:
Fig. 5.1
A Buzzer (service indicator)
B
Indicator light
C
Switch box with rotary switch 0-1
A
Fig. 5.1 Controls and indicators
5.2
Use
• Position the hood of the connected extraction arm at
400-800 mm (16-32 in.) from the source of pollution. Refer
to Fig. IV on page 53 for the correct position.
• Make sure that the shut-off damper (ref. Fig. 2.1F) is open.
• Put the unit on (ref. Fig. 5.1C).
• Start welding.
F
E (2x)
G
H
0
1
B
C
EN - 7
Tabla de contenido
loading

Este manual también es adecuado para:

Dual go plusMono goplus

Tabla de contenido