6
OPERATION
6.1
DAILY INSPECTION________________________________________________________
6
OPERATION
CAUTION
!
The daily inspection should be performed only when
the engine is off and all fluids are cold. Disengage all
drives, engage parking brake, stop engine, and
disconnect spark plug wire.
1. Perform a visual inspection of the entire unit, look for
signs of wear, loose hardware, missing, or damaged
components. Check for fuel or oil leaks.
6.2
OPERATOR PRESENCE CONTROL (O.P.C.)____________________________________
1. The O.P.C. system is intended to protect the operator
and others from injury by stopping the reel and drive
mechanism as soon as the operator releases the
O.P.C. bail. The unit is also equipped with an engine
stop (E-Stop) switch that will stop the engine from the
operator's position.
!
Never operate equipment with the O.P.C. system
disconnected
or
disconnect or bypass any switch.
2. To test the system:
a. Place mower on the kickstand.
b. Disengage the reel clutch lever (E).
3. Start the engine.
a. Slide bail to the left and engage OPC Bail.
b. Engine speed will increase, the drive mechanism
will engage, and the wheels will begin to turn.
c. Release
the
disengage, engine speed return to idle, and drive
mechanism must stop.
d. Push E-Stop switch down. Engine must stop
immediately.
4. If the drive mechanism engages before the O.P.C.
bail is engaged, or the drive mechanism continue to
turn after the O.P.C. bail is released, stop the engine
immediately and have the system repaired.
18
WARNING
malfunctioning.
Do
O.P.C.
bail.
The
bail
2. Check the fuel supply and crankcase oil level. All
fluids must be at the full mark.
3. Make sure the mower is adjusted to the required
cutting height.
4. Make sure the machine is lubricated and the
transport tires are properly inflated.
5. Check the O.P.C. system.
not
must