Phase 3: Fed Batch Concentration - GE Uniflux 10 Instrucciones De Funcionamiento

Tabla de contenido
B.2.5

Phase 3: Fed Batch Concentration

Purpose and structure
This phase will start the concentration of the feed.
Creating a phase: Fed Batch
Concentration
Follow the instructions below to create a new phase.
Step
1
2
UniFlux 10 Instrucciones de funcionamiento 28993587 AE
Action
Select the phase in the Phase Library pane and drag-and-drop the phase
to the requested position in the Method Outline pane. In the example, a
User Defined phase is used.
Result: The phase is included in the method at the requested position.
When the User Defined phase has been added to the Method Outline, the
phase name is enabled for editing.
Type a name for the phase, for instance Fed Batch Concentration, and press
the Return keyboard key.
Note:
The Fed Batch Concentration phase is marked with the letter T, meaning
that it is text edited. This phase contains only Base and End_Block instructions,
so any functional instructions must be added manually.
B Create a method with UNICORN 6 and above
B.2 An example of using the Method Editor
B.2.5 Phase 3: Fed Batch Concentration
243

Capítulos

Tabla de contenido
loading

Tabla de contenido