Start-Up - Pentair PVM Serie Instrucciones De Funcionamiento

Ocultar thumbs Ver también para PVM Serie:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 24
CHAPTER 7

START-UP

The pump and suction pipe should be filled with the liquid to be pumped before start-up to prevent dry running at start-up.
WARNING
Dry running can damage the pump bearing and shaft seal.
Before using the pump, read Application chapter for a proper use
EN
ORIGINAL INSTRUCTION
7

Capítulos

loading