6.3.5
O
Grounding of VS
CL03/CL03-XL
7
BUS OUT
X72
4
7.1
The following settings have to be made:
W
W
W
W
All of these settings are made with the switches beneath the cover of the
bus coupler. See Fig. 4 below for position of switches.
Proceed as follows to make the settings:
1. Remove the cover of the bus coupler by undoing the four screws (1).
2. Make the settings with the switches as described below.
3. Refit the cover carefully according to Fig. 4 below. Ensure that the
Fig. 4:
AVENTICS | DeviceNet | R402003659–BAL–001–AG
FE connection
To discharge EMC interferences, connect the FE connection (4) on
the bus coupler via a low-impedance line to functional earth.
Recommended cable cross-section: 10 mm
Commissioning and operation
Making settings
Setting the data rate
Setting the bus coupler address
Setting diagnostic messages
Selecting the valve supply
sealing (2) is positioned correctly. Tighten the screws (1) with a
torque of 1.0 to 1.2 Nm.
S4
S3
S2
S1
Removing/fitting the cover of the bus coupler
Commissioning and operation
2
1
2
67