Before Start Of Operation - Makita EN4950H Instrucciones De Manejo

Ocultar thumbs Ver también para EN4950H:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 122
FUEL/REFUELLING

BEFORE START OF OPERATION

oil pipe.
Recommended oil:
Oil volume:
Approx. 0.08 L
Point 1 in Replacement of oil: "Oil cap"
Fig. 1
Internal stepped
Internal stepped
Fig. 2 Oil pipe
Top up with oil
until oil level
reaches internal
stepped section
Fig. 3
11
The area between the
external upper and lower
Tabla de contenido
loading

Tabla de contenido