Installation Checklist; Tools Required; Intended Application - Honeywell TrueDRY DH150 Manual De Uso

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation Guide

Installation Checklist

Tools Required

- 3/8-in. hex drive
- Drill or duct-cutting tool
- Wire stripper/cutter
-
Standard screwdriver
- Duct tape
-
8-in. round duct and starter collar
- 18–22 gauge, 5-band thermostat wire
- 1/2-in. diameter drain line (8 ft)
- 1/2-in. drain clamps (quantity 2)
Materials Provided
- Sheet metal screws (quantity 9)
-
6-in. plastic duct collar
- 10-in. plastic duct collar
- 10-in. oval x 4 in. plastic duct collar
Options:
- 1/2-in. drain p-trap (may be required by local code)
- External humidity control
• Manual dehumidistat (H8908DSPST), Auto
Ventilation (W8150A1001)
• TrueIAQ (DG115EZIAQ)
• VisionPRO IAQ (YTH9421C1010)
WARNING: Installation must be performed by a qualified service technician and must comply with local
codes. Remove power to the device before installing or servicing the device. Failure to connect the
device according to these instructions may result in damage to the device or the controls.

Intended Application

For the ideal installation, draw air from the central part of the home and return it to isolated areas of the home like
the bedrooms, den, utility room, or family room. The ductwork of the existing system can be used to supply air to
the home.
69-2271EFS—01
4
Tabla de contenido
loading

Tabla de contenido