Periodic Maintenance Schedule - CAMPAGNOLA PUMA Manual De Uso Y Mantenimiento

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

6.3 – PERIODIC MAINTENANCE SCHEDULE
The following maintenance operations have to be
carried out only in case of tool proper functioning. If the
task is very hard, the operations shall be carried out
more frequently.
Complete tool
Check operating lever (5),
active safety device (6)
and inertial chain brake
(12) (only for the tool
version without connection
to an extension pole)
Inertial chain brake (12)
(only for the tool version
without connection to an
extension pole)
Oil reservoir (22)
Chain (15) lubrication
Chain (15)
Bar (14)
Chain locking pin (18)
All the screws and nuts
which can be reached
Check losses, cracks and
wear and tear
Check for proper
functioning
Check for proper
functioning
Check at an Authorised
Service Point
Check losses, cracks and
wear and tear
Check for proper
functioning
Check damages, wear
and tear, sharpening
Check its tension
Check the depth adjusting
device
Check the wear and tear
Check damages and
wear and tear
Replace
Check and, if necessary,
tighten
Before
After a
After a
every
working
working
use
day
week
X
X
X
X
X
X
X
X
X
X
X
X
X
X
After
If the
every oil
tool is
addition
damage
in the
d or
reservoir
faulty
X
X
X
X
X
X
X
X
At the
end of
every
working
season
–storing
time
X
X
X
Tabla de contenido
loading

Tabla de contenido