Mitsubishi Electric PAC-SF29LB Manual De Instalación página 9

R-converter unit
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38
(2) Insulate the thermistors with the supplied thermal insulation 7.
(3) Cut a 100 mm slit on the top portion of the extension piping pipe covers, and then cover the thermistors with the pipe covers.
Pipe cover
(4) Wrap the thermal insulation covering the thermistor with tape.
Caution:
Be sure to take out the thermistor lead from above.
(5) Cover the flare and thermistor with the thermal insulation (for protecting the flare) supplied with the indoor unit.
Bundle up the excess thermistor lead.
Caution:
Do not make the thermistor lead taut.
Do not add extensions to the thermistor lead.
Do not cut the excess thermistor lead.
Make sure that the bundled thermistor lead does not interfere with any other wiring.
Thermal insulation 7
Tape
Thermal insulation (for protecting the flare)
Tape
Tape the pipe cover slits so
that they do not come open.
Thermal insulation 7
Pipe cover (procure locally)
9
Tabla de contenido
loading

Tabla de contenido