Operation
Connection sockets (fig. 4, page 4)
Item Description
1
Connection socket AC voltage supply
2
AC fuse holder
3
DC fuse cover
4
Connection socket DC voltage supply
6
Operation
6.1
Before initial use
I
NOTE
Before starting your new cooler for the first time, you should clean it
inside and outside with a damp cloth for hygienic reasons (please also
refer to the chapter "Cleaning and maintenance" on page 22).
Mounting the handles (fig. 5, page 4)
The handles are enclosed unassembled. If you wish to attach the handles, proceed
as follows:
➤ Assemble a handle by putting two holders (1) and a handle (2) together.
➤ Fasten the holders with the enclosed screws in the holes provided.
Opening or removing the lid (fig. 6, page 5)
The lid can be opened from either side or removed completely without the need of
tools as follows:
➤ To open the lid, unlatch in the preferred opening direction, (A) or (B).
➤ To remove the lid, unlatch both sides at the same time (C).
Lid stop position (fig. 7, page 5)
The lid has a built-in stop position (A). Do not force the lid past the built-in stop (B).
14
CFF35, CFF45
EN