Idiomas disponibles
  • ES

Idiomas disponibles

ENGLISH
 
7
8
9
10
1 Heating and degas phases , if they are both preset, are carried out simultaneously for a
total time of 5 minutes.
7.1

Control panel

1
CYCLE START/STOP KEYS
1
STOP – IT STOPS THE CURRENT CYCLE
2
START – START CYCLE
PROGRAMMING KEYS
4
SELECT – NAVIGATION BUTTON
5
OK – CONFIRM SELECTION AND GO TO THE NEXT SECTION
3
DISPLAY
14
 
Second water draining
The tank is filled again to rinse tools
Ultrasound rinse
Short
activation
cavitation.
Draining
The tank drains automatically
Drying
To dry tools, the appliance generates a hot air
flow touching items and removing humidity as
vapour.
2
of
ultrasounds,
Notes:
3
1.5 min
P
(
infeed
rinse
by
4
5
=
2.5
bar)
1 min
8 min
15 min

Capítulos

loading