ACO LipuJet P-RB Instrucciones De Empleo página 78

Separador de grasa
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 205
LipuJet - P -RB / - RD / - RM / - RA / - RAP
Installation
2.6 High-pressure nozzle assembly
2.6.1 Components
1 = Plug for connection cable
2 = Drive motor
3 = Threaded connection for high-pressure hose
2.6.2 Position
2.6.3 Assembly
78/ 454
The high-pressure nozzle can be
positioned to the
of the centre axis of the tank.
Assembly on the left
below.
The opening (right or left) in the upper section is already prepared according to
the article number of the grease separator that was ordered.
Heaviest single component is approx. 2.2 kg.
Numbers in brackets " [ ] ",
"Components".
1
2
3
4
5
6
4 = Connecting flange with thread and clamping ring
5 = Drive shaft
6 = Nozzle
right
or left
described
Representation of the components _ Chap. 2.6.1
loading

Este manual también es adecuado para:

Lipujet p-rdLipujet p-rmLipujet p-raLipujet p-rap