Maxon 209880-01G Instrucciones De Montaje página 26

Idiomas disponibles

Idiomas disponibles

INSTALLING AUXILLIARY BATTERY HOLDER KIT - Continued
11. Remove the small parts and manual kit
from the mainframe housing on the Lift-
gate. Refer to Sheets 4 & 5 for contents
of the kits.
12. Cut Liftgate positive (+) cable to the length
required to reach the (+) terminal of the aux-
iliary battery (FIG. 24-2), without
putting strain on the connection. Install cop-
per lug (Kit item) (FIGS. 26-1 and 26-2).
13. Cut Liftgate negative (-) cable to length re-
quired to reach negative (-) auxiliary battery
terminal (FIG. 24-2) without put-
ting strain on the connection. Install copper
lug (Kit item) (FIGS. 26-1 and 26-2).
LIFT CORPORATION Sht. 26 of 76 DSG#
M-24-01
HEATSHRINK
TUBING
POWER CABLE
(BARE WIRE END)
PLACING COPPER LUG & HEATSHRINK
TUBING ON POWER CABLE
FIG. 26-1
TYPICAL POWER CABLE WITH
COPPER LUG INSTALLED
Rev. - Date: 05/07/24
COPPER LUG
FIG. 26-2
loading