Salicru IS Serie Manual De Usuario, Instalación Y Puesta En Marcha página 30

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

7.- STARTING.
7.1.- Preliminary checks before starting.
• Carefully make sure that all of the connections have been made correctly and are sufficiently tight, respecting
the labelling of the unit and the instructions in chapter 6.
• Make sure that all of the INVERTER switches are turned off. If the unit has the optional manual Bypass switch
(Q5), also ensure that the mechanical block (BL) is placed.
• Supply power to the equipment, operating the switch or switch box distribution DC line and AC line if the
equipment has to this input.
7.2.- Starting.
It is very important to start and stop the INVERTER in the established order (stopping being the reverse of starting),
considering the version of the equipment available and figures 4, 6 and 8.
• Turn to "I" or "On" the switch (Q1), the switch (Q4) (in version IS-B and IS-T) and the (Q7) (in versions IS-T).
• Turn switches (Q2) to "I" or "On", in the units that have this.
Depending the version of the equipment, from the time the mains voltage has been applied and switches (Q4), (Q7)
and (Q2) are turned on, in versions IS-B and IS-T, the voltage is present in the output by means of the static Bypass.
7.3.- Normal starting.
• Turn the switch (S1) to the position ( ), ad the inverter will supply AC output voltage based on DC input.
• Start the loads
7.4.- Daily stopping.
• Stop the loads.
• Turn the switch (S1) to ( ) or ( ), the inverter will be "Off".
We remind you that the units with static Bypass (versions IS-B and IS-T) are supplying voltage to the output, although
the INVERTER might be turned off (switch (S1) at ( )). Depending the version of the equipment, if you wish to completely
eliminate the voltage, switches (Q4), (Q7) and (Q2) must be turned off.
7.5.- Direct network output, manual Bypass. Only for use by AUTHORISED personnel.
• The manual Bypass is a useful element for preventive maintenance or in the event of a fault in the unit, and allows
the loads to the supplied directly from the commercial mains. It also allows the intervention of the T.S.S. (Technical
- 30 -
Tabla de contenido
loading

Tabla de contenido