klover STARBOX UP Instrucciones Para La Instalación, El Uso Y El Mantenimiento página 49

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 92
INSTALLATION
6.9
ASSEMBLING THE FIRE BRICKS
l
The product is supplied with side and upper fire
bricks that are dismantled to prevent them from
breaking during transport; they must be installed
only at the end of the installation phase.
a
Handle the refractory bricks very carefully as they do
not withstand impacts.
To mount the fire bricks, proceed as follows:
- open the door of the appliance, consult the paragraph
door"
- position the side bricks (1)
1
CS.VES.IST-1_EN_Rev. 0.0_09-23
"Opening the
1
Fig. 23
- subsequently, mount the upper bricks (2); support the side bricks
during the operation to prevent them from falling
- insert the locking profile (3).
2
3
2
Fig. 24
EN
19
loading

Este manual también es adecuado para:

Venus 90Venus 90 plusVenus 90 classicVenus 90 countryVenus 110Venus 110 plus ... Mostrar todo