Salicru BM-R Serie Manual De Usuario página 23

Ocultar thumbs Ver también para BM-R Serie:
Idiomas disponibles
  • ES

Idiomas disponibles

4. OVERVIEW.
4.1. VIEWS.
4.1.1. Equipment front views.
Fig. 1 and 2 show the corresponding illustrations of the rack
mounting manual bypass, ready to be installed in 19" rack cabinets,
although the 3 kVA model allows wall mounting installation too see
section 6 installation.
14
Fig. 1. Front view of the 3kVA rack mounting manual bypass.
14
11
12
Respect the phase and neutral rotation,
will be a short-circuit
will be switched.
Fig. 2. Front view of the 6 and 10kVA rack mounting manual
bypass.
USER'S MANUAL
7
4
8
3
2
6
13
9
8
otherwise there
when the manual bypass switch
4.1.2. Corresponding legend of the equipment's
views.
1
AC power supply IEC connector or input terminals.
2
To be connected to the UPS or stabilizer input.
3
To be connected to the UPS or stabilizer output.
4
IEC connectors or output terminals to loads.
5
Main protective earth (6 and 10 kVA models only).
6
Input circuit breaker switch (6 and 10 kVA models only).
7
Output thermic switches (2 sections in the 3 kVA model).
8
Manual bypass switch (Normal or Bypass positions).
9
Manual bypass signal auxiliary contact for signalling.
10
Terminal strip to connect with the EBMS signal of the UPS.
11
Protection cover for terminal power strip.
12
Cable gland for connection cables.
1
14
13
Manual bypass switch cover.
14
Angle support and screws to adapt the device to 19" rack
format.
14
4.2. PRODUCT DEFINITION.
4.2.1. Nomenclature.
BM-TWIN PRO2-RT2-6 2/2
10
Output voltage.
Input voltage.
Power.
Series.
Manual bypass acronym.
23
BM-R Rack mounting manual bypass
loading

Este manual también es adecuado para:

Bm-r 3Bm-r 6Bm-r 10Bm-r 16 aBm-r 40 aBm-r 63 a