Tripp-Lite SRXCOOL7KRM Manual Del Propietário página 4

Unidad de aire acondicionada para instalación en rack
Idiomas disponibles

Idiomas disponibles

Accessories
Warning: After removing the unit from the shipping container, check for damage or missing parts (refer to the parts list below).
If you notice a problem, visit tripplite.com/support for service. Do not attempt to operate a damaged unit.
Accessory Parts List:
4POSTRAILKIT
Installation
The procedures described in this section are for common rack and rack enclosure types and may not be appropriate for all applications. The
user must determine the fitness of hardware and procedures before mounting. If hardware and procedures are not suitable for your application,
contact the manufacturer of your rack or rack enclosure.
Caution: The user should always install the SRXCOOL7KRM in the lowest possible position in the rack and under any installed
equipment.
Square-Hole Rack Installation
1
The included plastic pegs
rackmount shelves
while you install the permanent mounting
B
hardware. Insert a peg near the center of the front and rear
bracket of each shelf as shown. Each front bracket has 6 holes
and each rear bracket has 3 holes. The pegs will snap into
place.
After installing the pegs, expand each shelf to match the depth
of your rack rails. The pegs will fit through the square holes
in the rack rails to support the shelves. Refer to the rack unit
labels to confirm that the shelves are level in all directions.
Note: The support ledge of each shelf must face
inward.
2
Secure the shelves
to the mounting rails permanently using
B
the included screws and cup washers
screws total at the front and 4 screws total at the back.
Tighten all screws before proceeding.
Warning: Do not attempt to install the SRXCOOL7KWM
until you have inserted and tightened the required
screws. The plastic pegs will not support its weight.
3
Attach the SRXCOOL7KWM's mounting brackets to the forward
mounting holes of the unit using the included hardware. The
mounting bracket "ears" should face forward.
4
With the aid of an assistant, lift the SRXCOOL7KWM and slide
it into the shelves. Attach the mounting brackets to the forward
mounting rails with user-supplied screws and washers
Tighten all screws securely.
Vent
will temporarily support the empty
A
as shown. Place 6
C
D
Drainage Plug (Pre-Installed)
B
A
1
B
C
2
3
.
D
4
4
Magnetic Door Panels
A
B
A
A
C
loading