Installing The Machine - Saivod TEIDE 450 T Instrucciones Para El Empleo

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

8
The machine must be installed by professionally qualified technicians, according to
the manufacturer's indications. Incorrect installation may result in damage to per-
sons and property.
The machine can be installed anywhere, provided the temperature in the place of
installation is not below 3°C and the cables and hoses at the rear of the machine are
not crushed in any way.
For transport purposes the swinging unit in the machine is blocked using 4
spacers with screws. Before starting the machine these spacers and lock screws
must be removed, and stored for use in the event of a possible change of loca-
tion.
Block off the holes with the plugs provided, which can be found in the bag
containing the documents.
For transport purposes the swinging unit in the machine is blocked using 4
spacers with screws. Before starting the machine these screws must be re-
moved using a screwdriver.
Insert a screwdriver in the holes and proceed as shown in the figure to recover
the 4 plastic spacers.
GB

INSTALLING THE MACHINE

(ACCORDING TO MODEL)
V
2
3
2A
3A
SM1097

Hide quick links:

Tabla de contenido
loading

Este manual también es adecuado para:

Veleta 450

Tabla de contenido