Waeco ASC 6300 G Instrucciones De Uso página 26

Estacion de mantenimiento de aire acondicionado
Ocultar thumbs Ver también para ASC 6300 G:
Idiomas disponibles
  • ES

Idiomas disponibles

EN    
enter the values for each individual process using the keypad. You can also enter the vehicle data for the service
report in this menu.
The following four processes can be performed individually in the Free selection menu:
• Recycling phase: Extraction, recycling of the refrigerant, pressure rise test, draining the waste oil.
• Vacuum phase: Evacuating the system, leak test / vacuum check.
• Filling phase: Before working on the vehicle air conditioner, a leak inspection must be carried out. The air
conditioner is filled with a sample of refrigerant. The pressure in the air conditioner must remain constant over
a period of 5 min. The air conditioner can only be completely filled if this test has been successfully complet­
ed. The sample filling is then drained and the air conditioner evacuated. The final filling quantity is completely
filled up to ensure high filling accuracy. Filling with fresh oil, filling of UV additive, filling of refrigerant.
• Selecting connections: The air conditioning system has a high pressure and low pressure connection, high
pressure or low pressure only connections.
After each process has been performed, a service report is printed.
1. Start by fitting the connections of the A/C service unit to the vehicle air conditioning system, and opening
them.
2. In the basic menu use the cursor keys   or   to select Free selection.
Short selection
Free selection
Other selections
ENTER‐OK
3. Press 
ENTER
4. Enter the vehicle data and press 
13.8.1 Recovery phase
1. Enter the preferred settings and press 
Rec/Recycling
phase?
ENTER‐OK STOP‐EXIT
2. If Rec/Recycling phase has been selected, enter the preferred waiting time for the pressure increase (stan­
dard is 1 min.) in the following menu and press 
um process on page 26.
Pressure increase
Test time
ENTER‐OK STOP‐EXIT
Note  The waiting time ensures that any residual refrigerant vaporises and can then be extracted. The
vaporising residual refrigerant triggers an increase in pressure.
13.8.2 Vacuum process
1. Enter the preferred settings and press 
Vacuum phase
ENTER‐OK STOP‐EXIT
2. If Vacuum phase has been selected, enter the preferred vacuum time (standard is 20 min), otherwise continue
with chapter Filling process on page 27.
3. Use the cursor key   to enter the vacuum phase time.
4. Press ENTER to confirm both settings.
26
 to confirm.
ENTER
ENTER
min.
ENTER
 to confirm.
 to confirm.
Yes
No
ENTER
 to confirm, otherwise continue with chapter Vacu
1
 to confirm.
Yes
No
loading

Este manual también es adecuado para:

Asc 6400 g9103303106