Sime AQUA HE 25 ErP.BE Instrucciones Para El Instalador página 83

Idiomas disponibles

Idiomas disponibles

steps.shown.in.fig..13.
4.5
DISASSEMBLY
OF EXPANSION VESSEL
.
The. heating. expansion. tank. is. disas-
sembled.in.the.following.manner:
–..Make.sure.that.the.boiler.has.been.
emptied.of.water.
–..Unscrew. the. union. which. connects.
the.expansion.tank.
–..Remove.the.expansion.tank.
Before.filling.up.the.system.make.sure.
that.the.expansion.tank.is.reloaded.at.
the.pressure.of.0.8.÷.1.bar.
4.6
BURNER MAINTENANCE
(fig. 14)
To. dismantle. the. burner. from. the.
boiler.door,.remove.the.screw.(fig..14).
To. access. the. internal. part. of. the.
burner,. remove. the. air. lock. unit. held.
in.place.by.two.screws.to.the.sides.and.
remove.the.right.hand.shell,.which.is.
held. in. place. by. four. screws,. taking.
care. not. to. damage. the. O-ring. seal..
OR.
4.7
CLEANING
AND MAINTENANCE
Preventive. maintenance. and. check-
ing. of. the. efficient. operation. of. the.
equipment.and.safety.devices.must.be.
carried.out.at.the.end.of.each.heating.
season. exclusively. by. the. authorised.
technical.staff.
4.7.1
Cleaning smoke
ducts (fig. 15)
Use.an.adequate.swab.for.cleaning.the.
smoke.ducts.of.the.boiler..
After.cleaning,.position.the.circulators.
in.their.original.position.(fig..15).
4.7.2
Cleaning combustion head
(fig. 16)
The.combustion.head.is.cleaned.in.the.
following.manner.(fig..16):
–. Disconnect. the. high. tension. cables.
from.the.electrodes.
–. Unscrew. the. fixture. screws. of. the.
circulator.support.and.remove.it.
–. Brush.the.propeller.delicately.(tur-
bulence.disc).
–. Carefully. clean. the. photo-resist-
SCREW
VITE
ance. of. eventual. deposits. of. dirt.
deposited.on.its.surface.
–. Clean. the. remaining. components.
of.the.combustion.head.of.eventual.
deposits.
–. Upon. completion. re-assemble. the.
unit.in.the.opposite.way.as.described.
above. taking. care. to. respect. the.
indicated.measurements.
RONDO' 3/4 OF
ESTELLE 3/4 OF
RONDO' 5/6 OF
ESTELLE 5/6 OF
4.7.3
Substitution of nozzle
The. nozzle. should. be. substituted. at.
the.beginning.of.every.heating.system.
for.guaranteeing.the.correct.fuel.flow.
and.a.good.spray.efficiency..
The.nozzle.is.substituted.in.the.follow-
ing.manner:
–. Disconnect. the. high. tension. cables.
Fig..14
Fig..15
83
loading

Este manual también es adecuado para:

Aqua he 35 erp beAqua he 25 inox erp.beAqua he 35 inox erp be