Ohyama WOOZOO IHF-1201G-E Manual De Usuario página 35

Idiomas disponibles
  • ES

Idiomas disponibles

Installation of indoor unit
Step one: choosing installation location
Recommend the installation location to the client and then confirm it with the client.
nd
Step two: install wall-mounting frame
1. Hang the wall-mounting frame on the wall; adjust it in horizontal position with
the level meter and then point out the screw fixing holes on the wall.
er
2. Drill the screw fixing holes on the wall with impact drill (the specification of drill
head should be the same as the plastic expansion particle) and then fill the
plastic expansion particles in the holes.
3. Fix the wall-mounting frame on the wall with tapping screws and then check if
the frame is firmly installed by pulling the frame. If the plastic expansion particle
is loose, please drill another fixing hole nearby.
Step three: open piping hole
1. Choose the position of piping hole according to the direction of outlet pipe. The
position of piping hole should be a little lower than the wall-mounted frame,
shown as below.
s.
QB:
Wall
Space
to the
te
above
150mm
Left
Φ55mm
(Rear piping hole)
QD:
Wall
Space
to the
above
ed
150mm
Left
Φ55mm
(Rear piping hole)
2. Open a piping hole with the diameter of Φ55 or Φ70 on the selected outlet pipe
in
position. In order to drain smoothly, slant the piping hole on the wall slightly
downward to the outdoor side with the gradient of 5-10°.
Level meter
Mark in the middle of it
wall
Level meter
Mark in the middle of it
wall
QC:
Wall
Wall
Space
Space
to the
to the
wall
wall
above
above
150mm
150mm
Right
Left
Φ55mm
Φ55mm
(Rear piping hole)
(Rear piping hole)
QE:
Wall
Wall
Space
Space
to the
to the
wall
wall
above
above
150mm
150mm
Right
Left
Φ55mm
Φ70mm
(Rear piping hole)
Rear piping hole
32
Level meter
Mark in the middle of it
(Rear piping hole)
Level meter
Mark in the middle of it
Rear piping hole
Wall
Space
to the
wall
above
150mm
Right
Φ55mm
Wall
Space
to the
wall
above
150mm
Right
Φ70mm
loading