Garland CRUMMER 1220 QGW Manual De Instrucciones página 35

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
6. START UP INSTRUCTIONS
6.1. UNPACKING AND LIST OF MATERIALS
This machine includes the following items that you will
find inside the box:
1 Hopper
2 Machine body
3 Battery
4 Outlet pipe deflector
5 Rear support
6 Wheel (x2)
7 Wheel axle (x2)
6.2. MOUNTING
6.2.1. MOUNTING THE WHEELS AND REAR SUPPORT
Put the wheel axle (B) through the front of the machine
body, then hook the wheels (C). Add the flat washer
(H) Ø8, the Grower washer (G) Ø8 and the screw (F)
M8x20 on both sides of the shaft until they are well
tightened.
Install the rear support (A) at the rear of the machine
body by securing it with the M8 nuts (I).
6.2.2. MOUNTING THE HOPPER AND BATTERY
COMPARTMENT
Install the feed hopper (D) at the front of the machine
and fix it with the flat washer (J) Ø8, Grower washer
(G) Ø8 and screw the nut (I) M8 until it is tight.
35/148
English
loading