GreenWorks Pro BPB60L02 Manual Del Operador página 7

Idiomas disponibles

Idiomas disponibles

10.2
INSTALL THE TRIGGER HANDLE
1. Move the trigger handle (11) onto the connecting tube
(6).
2. Use knob to tighten the screw.
10.3
INSTALL THE CONNECTING
TUBE
12
English
11
6
13
1. Align the rib (12) on the connecting tube with the slot
(13) in the flexible tube.
2. Put the end of the connecting tube (6) into the flexible
tube.
3. Push the connecting tube into the flexible tube.
4. Put the hose clamp (14) around the flexible tube.
5. Install and tighten the available screw into the hose clamp
(14).
10.4
INSTALL THE REAR BLOWER
TUBE
5
1. Align the grooves on the rear blower tube (5) with the
tabs on the connecting tube (6).
7
EN
14
6
loading

Este manual también es adecuado para:

Bpb60l512