GE ASH12 Manual Del Propietario Y Instrucciones De Instalación página 11

Idiomas disponibles

Idiomas disponibles

Window Installation Instructions
1
WINDOW REQUIREMENTS
• These instructions are for a standard
double-hung window. You will need to
modify them for other types of windows.
CAUTION:
bolts do not contact the window sill,
or if you have a window without a sill,
you must order accessory kit RAK87 to
properly install this air conditioner. Call
800.626.2002 or visit ge.com.
• All supporting parts must be secured
to firm wood, masonry or metal.
• The electrical outlet must be within
reach of the power cord.
26"–39-1/2"
(With accordion panels)
All manuals and user guides at all-guides.com
If the sill support
15-3/8"
STORM WINDOW REQUIREMENTS
2
A storm window frame will not allow the
air conditioner to tilt toward the outside,
and will keep it from draining properly.
To adjust for this, attach a piece of wood
to the sill.
WOOD PIECES –
WIDTH: 2"
LENGTH: Long enough to fit inside the
window frame.
THICKNESS: To determine the thickness,
place a piece of wood on the sill to make
it 1/2" higher than the top of the storm
window frame or the vinyl frame.
Attach securely with nails or screws
provided by the installer.
1/2" higher
than storm
window
frame
Storm window
frame
REMOVE THE FRONT GRILLE
3
(IF ATTACHED)
A
Remove shipping tape, if present.
On models with a
raise-up inlet grille,
lift it and remove
the screw behind it
(if present) that holds
the grille in place.
On models with a
slide-out air filter,
remove it and the
screw behind it
(if present) that holds
the grille in place.
B
Gently but firmly grasp
the lower grille corners,
press in on the case
sides and pull forward
to release.
NOTE: Do not pull the
bottom edge toward
you more than 3" or
you may damage the tabs of the grille.
Lift the grille up and off the top tabs.
C
11
1/2" higher
than vinyl frame
(on some windows)
Wood
Sill
Vinyl frame
loading

Este manual también es adecuado para:

Ash12al