GE ASH12 Manual Del Propietario Y Instrucciones De Instalación página 12

Idiomas disponibles

Idiomas disponibles

Window Installation Instructions
REMOVE THE AIR CONDITIONER
4
FROM THE CASE
Remove the 2 or 4 screws (depending on
A
model) on each side of the case. Keep the
2 front-side screws for later use.
Front of air conditioner
B
Slide the air conditioner from the case by
gripping the base pan handle and pulling
forward while bracing the case.
Front of air conditioner
Remove packing cardboard and tape,
if present.
All manuals and user guides at all-guides.com
12
PREPARE THE CASE
5
A
Remove the backing from the top mounting
rail seal strip and attach it to the bottom of
the top mounting rail. Cut to size.
Install the top mounting rail with 4 or 5 type
B
A screws (depending on the number of
holes in the top mounting rail) from the
outside of the case.
Top mounting rail
C
Insert the frames for the accordion panels
into the top and bottom mounting rails.
Attach the accordion panels to the side
of the case using 6 type A screws.
Accordion
panel
Type A
screws
Bottom mounting rail
Top mounting rail
BACK
Bottom mounting rail
loading

Este manual también es adecuado para:

Ash12al