HTW -TD-030KOID Manual De Usuario E Instalacion página 25

Idiomas disponibles
  • ES

Idiomas disponibles

Where water is used, it shall be able to drain smoothly.
3
4
Under normal use, the handle of the safety valve (Fig. 3) should be opened
regularly to remove calcium carbonate deposition. The method is: pull the
discharge handle upward to the horizontal position (if the handle is equipped
with screws, remove the screws with a screwdriver before doing this action),
and confirm whether the safety valve is blocked (whether there is water
discharge). If it is blocked, please contact the maintenance department.
(8) If users want multi-channel water supply, they can connect the water pipe
according to the method shown in Fig 4.
(9) After confirming that the rated values of electricity meters, wires, switche
sockets and fuses in the power supply system meet the power consumption
requirements of this product, connect a separate power socket at an
appropriate position to supply power to the electric water heater (as shown
in Figure 5). The installation height of power socket from the ground shall
not be less than 1.8m.
(10) After confirming that the rated values of electricity meters, wires, switches,
sockets and fuses in the power supply system meet the power
consumption requirements of this product, connect a separate power
socket at an appropriate position to supply power to the electric water
heater (as shown in Figure 5). The installation height of power socket from
the ground shall not be less than 1.8m.
Notes:
Do not put the socket in a place where water is easy to get into.
1
The socket must have a reliable grounding wire.
2
The socket should be kept dry to prevent leakage.
3
Electrical installation must be carried out by professionals.
3. Inspection and Commissioning
(1) The pipeline connection and direction shall be reasonable, and there shall
be no water leakage at each connection.
(2) The electrical configuration shall be safe and correct, the electric water
heater shall be reliably grounded, and the power plug and socket shall
cooperate closely.
(3) The mechanical connection shall be firm and reliable.
(4) Check the possible leakage parts of the shell with a test pen or
multi-meter to ensure that the electric water heater is safe and normal.
(5) The electric water heater shall operate according to the use method
in this manual, and all performance indexes shall be consistent with
this manual.
6
loading

Este manual también es adecuado para:

Htw-td-050koidHtw-td-080koidHtw-td-100koid