mabe MMI12CABWCAM9 Manual De Instrucciones página 78

Ocultar thumbs Ver también para MMI12CABWCAM9:
Idiomas disponibles

Idiomas disponibles

78
Cutting and flaring work of piping
• Pipe cutting is carried out with a pipe cutter and burs must be re-
moved.
Flare die
A
1. Cut pipe
2. Remove burs
3. Insert flare nut
drainage
• Install the drain hose so as to be downward slope without fail.
• Do not install the drainage as shown below.
Too high
midway
• Pour water in the drain pan of the indoor unit and confirm that
drainage is carried out securely outdoors.
• In case that the attached drain hose is in a room, please apply heat
insulation to it without fail.
Correct
Correct
End immersed
Waves
in water
4. Flare pipe.
Incorrect
Lean
Damaged
Cracking
flare
Incorrect
Partial
Flare too
flare
large
Less than
5 cm
Clearance with
Bad odor from
floor is too small
ditch
loading