Haier HD90-A3Q979U1 Manual Del Usuario página 26

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 222
12-Installation
Notice: all installation relevant pictures can be found at the
beginning of this manual.
12.1 Preparation
Remove all packages including the polystyrene base firstly. While removing the package,
water drops may be observed. This is normal phenomenon results from water test
the factory.
Notice
Dispose of the package in an environmental friendly manner. For information referring
to current disposal sites, consult your retailer or the local authorities.
WARNING!
After transportation and installation, you MUST leave the dryer to stand for two
hours before use.
12.2 Transport and waiting time
Transport the appliance in horizontal position only. To the maintenance-free lubrication
oil is located in the capsule of the compressor. This oil can get through the closed pipe
system during slanting transport. Before connecting the appliance to the power supply
you have to wait 2 hours so that the oil runs back into the capsule.
12.3 Place the appliance
The appliance should be placed on a flat and solid surface. Set the feet to the desired
level(Fig. 12-1).
12.4 Installation under worktop
The dimensions of the recess should at least match with the dimensions( F ig. 12-2) .
1. Put the appliance adjacent to the slot. Make sure that all connections are easily accessible
and functional.
2. Adjust accurately all feet to get a fi rm level position.
3. Install the appliance prudently into the recess.
4. Make sure a suffi cient ventilation.
OPTIONAL:Install noise reduction pads
1. When opening the shrink package,you will find three noise reduction pads. These are
used for reducing noise(Fig. 12-3).
2. Lay the dryer machine down to its side, porthole pointing upwards,bottom side towards
operator.
3. Take out the noise reduction pads and remove the double-sided adhesive protective
film; paste around the bottom; the noise reduction pads under the dryer machine cabinet
as shown in Figure 3(longer pad in position 1 , two shorter pads in position 2 and 3). Finally
set the machine upright again.
12.5 Electrical connection
Before each connection check if:
Power supply, socket and fusing are appropriate to the rating plate.
The power socket is earthed and no multi-plug or extension.
26
EN
loading

Este manual también es adecuado para:

Hd90-a3q979su1