PYD Electrobombas VERTINOX Serie Manual De Instalación Y Mantenimiento página 33

Electrobombas centrífuga vertical
Ocultar thumbs Ver también para VERTINOX Serie:
Idiomas disponibles

Idiomas disponibles

OPERATING AND MAINTENANCE MANUAL
VERTICAL ELECTRIC PUMP VERTINOX SERIES
VERTINOX 32, 45, 64, 90. Coupling system.
The correct installation diagram of coupling
1. Take out adjust plate, put it in the
position as diagram indication.
2. Install guard cover.
www.proindecsa.com / [email protected]
1. Screw down the bolt of mechanical seal.
2. Lift the shaft.
3. Put down the adjust plate.
4. Put down the shaft.
5. Install coupling.
correct
wrong
wrong
correct
33
wrong
loading