3M DBI SALA SALALIFT Instrucciones Para El Usuario página 16

Idiomas disponibles
  • ES

Idiomas disponibles

Rope
Verify the rope is fully seated in the Drum by raising and lowering a load of at least 100 lb.
(35 kg). If the rope slips during this operation, apply tension to the free end of the rope while
raising the load until slippage is eliminated
Gear Mechanism
Ensure the ratchet pawls, gears, brake assembly is free of corrosion and the parts
are free to rotate.
Labels (Figure 15)
Verify that all labels are securely attached and are legible (see 'Labels')
PFAS and Other
Additional Personal Fall Arrest System (PFAS) equipment (harness, SRL, etc) that are used with
the Flexiguard Anchorage System should be installed and inspected per the manufacturer's
Equipment
instructions.
(Figure 2)
Remove cover (N) to inspect for corrosion, wear, and to ensure pawls are rotating freely.
Serial Number(s):
Model Number:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Date Purchased:
Date of First Use:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
loading

Este manual también es adecuado para:

Dbi sala salalift ii