Preparation For Operation - Steinberg Systems SBS-FZ 2000/6M Manual De Instrucciones

Ocultar thumbs Ver también para SBS-FZ 2000/6M:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 48
3.2.

Preparation for operation

ASSEMBLY OF THE UNIT
Before installing the unit in the workplace, check its components for signs
of damage.
Make sure that the load-bearing structure on which the device is to be
mounted will support its weight together with the weight of the load.
The support on which the device is to be mounted must withstand 4 times
the rated load.
Do not mount the unit on a support structure the load capacity and
strength of which have not been verified.
When mounting the unit to the supporting structure, take special care and
ensure proper conditions for safe operation to avoid hazards leading to
personal injury.
The user is responsible for preparing the conditions for the installation of
the device and for the installation itself.
After installing the unit, check that the hook is properly attached and that
the latch is closed.
Each time a load is lifted, check that the safety brake is working properly.
To do this, hang a load on the device (approx. 10% of the permissible lifting
capacity) and raise and lower it several times, making sure that after
stopping lifting/lowering the load always stops in a given position without
lowering itself.
1.
Hook for hanging
2.
Lifting chain
3.
Control chain
4.
Hook for the load
Tabla de contenido
loading

Este manual también es adecuado para:

Sbs-fz 5000/3mSbs-fz 1000/6mSbs-fz 3000/5mSbs-fz 3000/12mSbs-fz 3000/10mSbs-fz 2000/5m ... Mostrar todo

Tabla de contenido