Upgrade - EBARA Ego 2 slim Manual De Instalación Y Operación

Ocultar thumbs Ver también para Ego 2 slim:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

4.2

UPGRADE

Ego 2 slim pump scan be upgraded with Module C electronics. The upgrad comes with all the standoffs and
screws.
1. Step – Turn off power
2. Step – Remove the front cover 2x M4x25 (Phillips screwdriver PH2). – (2)
3. Step – Remove the electronics cover 4x M5x12 (Torx 25). – (3)
4. Step – Install 2 steel stand offs. – (4)
5. Step - Install the plastic stand off. – (5)
6. Step - Install the S, U or C electronics in to the three pole connector.
7. Step – Screw in the plastic screw M3x6 (Phillips screwdriver PH1). – (7)
8. Step – Screw in the steel screws M3x6 (Phillips screwdriver PH1). – (8)
9. Step – Remove the plastics on the electronics cover that cover the connectors.
10. Step – Reinstall the electronics cover 4x M5x12. (Torx 25).
11. Step – Connect the necessary wiring to the S, U or C electronics.
12. Step – Reinstall the front cover 2x M4x25 (Phillips screwdriver PH2).
13. Step – Turn on power.
Tools
Phillips screwdriver PH2
Torx 25
Phillips screwdriver PH1
27
Tabla de contenido
loading

Tabla de contenido