OPERATING AND MAINTENANCE MANUAL
SOLAR PUMPING GROUP SERIE TH
+
-
Panel connection for
12v pump
+
-
+
-
+
-
+
-
+
-
+
-
+
Installation for 48V pump
(Four 17.5V panels connected in series)
+
-
+
-
+
+
-
+
-
+
+
Installation for 150V pump
1. Connect two sets of five 30.5V panels in parallel.
2. Connect both sets to each other in series.
+
-
+
Panel connection for 24V pump
(two 17.5V panels connected in
series)
+
-
+
-
-
-
+
-
+
-
-
+
-
+
-
-
-
+
-
Panel connection for pump
(three 17.5V panels connected in series)
+
-
+
-
+
-
+
-
+
-
+
-
+
Installation for 110V pump
1. Connect two sets of eight 17.5V panels in parallel.
2. Connect both sets to each other in series.
+
-
+
-
+
+
-
+
-
+
+
Installation for 220V pump
1. Connect two sets of seven 35V panels in parallel.
2. Connect both sets to each other in series.
23
+
-
+
-
36V
+
-
+
-
+
-
+
-
+
-
+
-
+
-
+
-
-
+
-
+
-
+
-
-
+
-
+
-
+
-
ENG
+
-
+
-
-
+
-
+
-
-