WARNING! Check that the water circuit safety valve is working;
The commissioning procedure must be carried out by performing the following procedures:
6.1. Filling the tank with water.
Fill the boiler by opening inlet tap No2 (Fig. 8) and the tap hot water of your bathroom. The tank is fully filled with water,
when only water without air starts leaking trough the tap in the bathroom. Check that there are no leaks from gaskets and
connections. Tighten the bolts or connections where necessary;
7.
OPERATING MODES. USER INTERFACE. INITIAL CONTROLLER ADJUSTMENT.
Electrical heater
'ON'/'OFF' button
Unit 'ON'/'OFF'
button
UP adjust
button
- Display Symbol;
7.1. User interface – Buttons and their function explanation.
7.1.1. Power 'ON'
When the unit is connected to the main power supply, all icons are displayed on the controller screen for 3 seconds.
After functionality check, the unit enters into the "standby" mode (OFF):
7.1.2. button
Press this button and hold it for 2 seconds when the unit is in standby, the unit will be turned 'ON'.
Press this button and hold it for 2 seconds when the unit is running, the unit will be turned standby.
Short press this button to enter or exit the parameter setting or checking.
- Button symbol
"Standby"
17
Set button
Clock/Timer setting button
DOWN adjust button