Robern Uplift Tech Ganging Kit Instrucciones De Montaje página 8

Tabla de contenido
SURFACE MOUNT
1. Ensure cabinet mounting bars are spaced 3" apart between cabinets.
2. Hang the first cabinet on the left facing mounting bar. Install the 4 lower mounting clips onto the cabinet as shown in the Cabinet
installation instructions / Surface Mount installation instructions.
3. Position a 25" long 2x4 on the right side of the cabinet, against the backside of the cabinet flange, and secure with two #10 screws
supplied with cabinet as shown below.
4. Clean edge of cabinet with alcohol, allow to dry.
5. Peel paper backing from spacer and apply on cabinet box.
6. Verify door opens and closes properly.
1
25.000
5
© 2019 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376
www.robern.com
Installation instructions
SURFACE MOUNTED GANGING
3
3"
(76 mm)
Top View
2x4
SURFACE MOUNTED GANGING
25.000
Cabinet
2x4
Spacer
25.000
8
Top View
Wall
Cabinet
2x4
Wall
Part no. 209-1318-A rev. 08/21/19
.500
Ganging Kit
Tabla de contenido
loading

Tabla de contenido