1) INSTALLATION INSTRUCTIONS

2) Pneumatic self-supporting framework
3) PRECAUTIONS FOR USE (The product guarantee depends on the respect for these rules)
INSTALLATION and START UP
For products delivered with filters, these must be installed in accordance with the instructions.
Before commissioning any of our valves, it is essential to carefully drain
the pipes that can damage the mechanisms or water passages (PRESTO® heads that can be dismantled from front).
Recommended operating pressure according to NF EN 816: 1 to 5 bars.
CLEANING
The chrome-plated coating of PRESTO® valves must be cleaned only with soapy water.
Abrasive, acid, alkaline or ammonia-based household products are prohibited.
4) Self-supporting tank framework for 3-6 litre pneumatic control Part no. 18588
5) Technical characteristics:
- NF self-supporting framework, width 300 x height 1120 x depth 190 made of 40 x 50 steel section.
- 3/6 litre anti-condensation tank with pneumatic control
- Equipped with a double volume valve, a male G1/2" shut-off valve and an NF float valve class 1 quiet.
- Adaptable drain pipe for vertical or horizontal PVC output with a diameter of 100mm, depth adjustable over 60 mm
and drain sleeve WC Ø 90/100.
- Ø.40 bowl tank-tube with Ø 55 lip seal for bowl.
- Complete bolting, 12 x 200 threaded rods and nut cover.
- With or without control plate (according to references)
6) Packing:
- Packing may be made of gypsum board, cellular concrete, marine fibre board or other materials; it may also then be
tiled, decorated or coated, etc.
!
- The recommended minimum thickness is 26mm (2 x BA 13 plates).
The packing can be fitted to the entire height of the part or up to the frame height to cover an edge.
- Accessibility for maintenance either via the upper shelf or the pipe gallery.
7) Feed
8) Section 40x50
9) Minimum 1120mm - Maximum 1270mm
1120 for bowl 400 from the finished floor
1220 for bowl 500 from the finished floor
10) Drain pipe adjustment
11) Bowl 400 from the finished floor
12) 100mm PVC pipe to be bonded
13) Finished floor
14) Fitting and adjusting the framework
15) drill bit Ø10
16) Vertical output
17) Horizontal output
18) Fitting the bowl
29) Tank
20) 1 - 1/2" female shut-off valve and copper + nut
2 - Float valve
3 - Float valve attachment clips
4 - Emptying pneumatic valve
5 - Tank and counter plate attachments
6 - Cover
7 - Embedding tube
21) Water inlet connection
22) Connecting the water inlet to female ½ stop valve
23) Removing the pneumatic control plate
24) Removing the valve and changing the seal
25) Emptying mechanism Part no. 90790
26) Mechanism membrane (x5) Part no. 90786
27) Removing the float valve
28) Unclip the float valve
29) Close the shut-off valve
30) Unscrew the copper nozzle
31) Float valve Part no. 90787
32) Float valve membrane (x5) Part no. 90788
33) This document is not contractual; we reserve the right to modify the characteristics of our products without notice.