5.1.2 Wall clearances

Fig. 6 Recommended minimum wall clearances

5.1.3 Positioning the tank

▶ Unpack the tank by removing the wrap, wooden boards and foam pad
on the top.
▶ Lay the foam pad on the floor to serve as a mat.
Fig. 7 Unpacking the DHW tank
▶ Carefully place the DHW tank on the cover pad [1].
▶ Cut out the raised sections in the EPS bottom pad [2].
SU54/5, SU80/5, SU100/5 – 6 720 808 532 (2013/08)
▶ Unscrew the screw-in feet [3].
1.
2.
6 720 801 769-03.1ITL
Fig. 8 Laying the DH tank on its side and exposing the adjustable feet
▶ Position the DHW tank on a level floor with adequate load-bearing
capacity.
Fig. 9 Positioning the tank
6 720 800 035-04.1ITL
▶ Maintain minimum wall clearances.
▶ Using the adjustable feet, align the DHW tank vertically.
5