Cembre DBSN Manual De Uso Y Mantenimiento página 4

Idiomas disponibles
  • ES

Idiomas disponibles

ENGLISH
Clamping the drilling machine to the rail fl ange (Ref. to Fig. 7)
To clamp the drill complete with the DBSN device to the rail, proceed as follows:
– Lift clevis (3) from its housing, so to manually slide the entire complete "tooth (2) - screw (4)" as-
sembly into the "fully open" position.
– Insert the drill, keeping it slightly inclined downwards, underneath the rail fl ange near the point
to be drilled (see Fig. 7a).
– With the positioning template inserted between the head and fl ange of the rail, bring the drill
into the horizontal position: the rail fl ange must be parallel with the base of the DBSN clamping
device (see Fig. 7b).
– Slide the "tooth-screw" assembly by hand into the "fully closed" position so that the tooth (2) is sup-
ported on the edge of the rail fl ange (see Fig. 7c).
If this cannot be achieved, adjust screw (4).
– Relocate clevis (3) and tighten screw (4) with a 19 mm socket/spanner, to achieve fi rm clamping
to the rail fl ange (see Fig. 8).
N.B.: To be able to locate clevis (03) in its working position, screw head (04) must lean against the
body of the DBSN device.
– To remove the drill from the rail proceed as follows:
– Slacken screw (4) just enough to release the clevis (3);
– Lift the clevis and slide the "tooth (2) - screw (4)" assembly by hand into the fully open position,
which enables the drill to be removed from the rail fl ange.
ATTENTION:
With a cutter/bit fi tted and the drilling machine clamped to the rail, to avoid advance lever
interference in train area, ensure before drilling, that:
• The spindle shaft is completely withdrawn and the advance lever is parallel with the axis of
the rail, facing in the direction shown in Fig. 2.
• Check that the lever is not free to move.
36
FIG. 2 – INITIAL POSITIONING OF THE LEVER
4
loading