As each wall panel or corner panel is erected and locked in an adjoining
panel along the vertical joint, engage the section latches to the floor
panels by turning the hex locking wrench ONLY ABOUT 1/4 TURN
CLOCKWISE.
Make certain that the wall or corner
panel is perfectly aligned with the
floor panel or foamed sealer before
engaging the section latches.
Continue erecting panels according
to the part numbers shown on the
floor plan, and follow, explicitly,
the technique described for panel
alignment.
CEILING PANELS will be erected at
specific
intervals
to
facilitate
the
installation.
The intermittent ceiling
panel erection is scheduled to allow the
ceiling panels to serve as supporting ties
between opposite walls as the installation
progresses. CAUTION! DO NOT SLIDE
CEILING PANELS INTO POSITION! To
avoid gasket damage, elevate the ceiling
section clear of the wall section while
bringing it into position.
When adjoining ceiling panels are in position,
adjust the exterior edges so that they are perfectly
flush with one another and with the wall panels
directly below them.
Lock the ceiling panels
securely to each other. DO NO LOCK ceiling
panels to wall panels at this time.
NOTE:
If local conditions, such as existing
building walls, make it difficult to align ceiling
panels with each other from the exterior, locate
a step ladder near the interior walls to visually
inspect the alignment and adjust as necessary.