Norlake KOLD LOCKER Manual De Instalación página 13

Ocultar thumbs Ver también para KOLD LOCKER:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

W
-I
I
ALK
N
NSTALLATION
WALK-IN INSTALLATION
Wall & Ceiling Panel Erection
The installation instructions that follow apply to any walk-in cooler or
freezer where the wall panels are supported either by foamed walk-in
floor panels or by a floor sealer (screed) assembly which has been
accurately located and properly leveled. NOTE: The procedure for
erecting wall and ceiling panels will be identical in all cases except that
wall panels do not lock to 1" vinyl floor sealers (screeds).
To aid in the erection process, the floor plan furnished with your walk-in
has part numbers listed for each wall, corner, ceiling and floor section.
Match the part number on the floor plan to the label on the interior of
each panel to determine the current placement for each panel.
Notice, also, that the section latch
access holes on the vertical edge
of the panel are always on the
interior of the panel.
Position the corner panel in the
proper location on the walk-in floor
or vinyl screed assembly and, IF
THE WALK-IN HAS A FLOOR,
flush the corner panel with the
corner of the floor panel in both
directions and lock it securely to
the floor panel.
12
-W
& C
ALL
EILING
P
E
ANEL
RECTION
Select the first panel to be installed,
normally begin with a CORNER PANEL.
Notice that the panel is labeled "Top" along
with a part number indicating that when the
panel is in its proper position, the labeled
end will be up.
© 2008 Nor-Lake 4/08 PN 121428
Tabla de contenido
loading

Tabla de contenido