TECHNICAL INFORMATION:

Composition:

1.
handle
2.
screw
3.
sliding disc
4.
Teflon ring
5.
nipple
6.
ring nut
7.
O ring
8.
O ring
9.
cartridge
10. tap body
11. bushes
12. springs
Supply
Hot water temperature
Working pressure
If working pressure is over 5 BAR, we recommend using a pressure reducer. This tap
is not compatible with the use of low-pressure instantaneous hot water heaters.
TIPS ON INSTALLATION:
Important: the hot water must be connected to the left pipe, the cold water to
the right pipe.

INSTALLATION:

After shutting off the water supply, remove the old tap.
Clean the threads of the main supply thoroughly.
Instructions for correct installation:
Fig. D
Place the O ring -20- into the recess in the tap body. Fit the mixer through the hole in
the sink.
Fig. E
Onto the threaded stud -22- fit the shaped seal -23- the flange -24- and then tighten
the tap with the stay -25-.
(If necessary use the spacing flange -21-).
Connect the supply pipe -26- hot water to the left, cold water to the right.
13. lip seal
14. Teflon ring
15. nozzle
16. Teflon ring
17. O ring
18. vertical pipe
19. aerator
20. O ring
21. spacing flange
22. stud bolt
23. shaped seal
24. flange
Recommended
65°
3 BAR
17
25. stay
26. supply pipes
Maximum
80°
5 BAR
Minimum
15°
0.5 BAR
Tabla de contenido