Stuffer Assembly - Weston 33-1301-W Manual De Instrucciones

Ocultar thumbs Ver también para 33-1301-W:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

STUFFER ASSEMBLY

!
WARNING
ENTANGLEMENT HAZARD: Disconnect power before
cleaning, disassembling or assembling.
FIGURE F
1. Unplug from outlet.
2. Remove the Ring Nut, Grinding Plate,
Knife and Auger from the Grinder Head
before installing the Grinder Head to the
Main Body.
3. Align the notches on the Grinder Head
with the tabs on the Main body.
4. Insert the Grinder Head into the Main
Body and push the lever up to lock into
position (FIGURE F).
5. Insert the Auger into the Grinder Head,
Auger Driver end first (FIGURE G).
6. Place the Grinder Knife onto the square
portion of the Auger Pin. The cutting edges
(flat side) of the Knife should be facing out.
7. Place the Grinding Plate of your choice
FIGURE G
onto the Auger Pin. Make sure the notch of
the Grinder Plate fits into the positioning pin
of the Grinder Head.
8. Insert the Stuffing Funnel through the
Ring Nut and then onto the Grinder Head.
9. Turn the Ring Nut clockwise onto the
threaded end of the Grinder Head until it
touches the Stuffing Funnel. DO NOT over-
tighten the Ring Nut.
10. Place the Tray on the upright part of
the Grinder Head. NEVER use the Grinder
without the Tray installed!
Auger
Driver
11
Tabla de contenido
loading

Tabla de contenido